Our process.

  • Timeline

    Our pools take 6-8 weeks from the day that installation starts until we receive the final inspection to swim! The pool itself is a 1-day install, but our trade partners need time to ensure their parts are completed with the utmost quality. Nordic Pools can have you swimming approximately 10-12 weeks from the day you sign your contract with us and begin the design/permit process.

  • Initial Consultation

    We start by scheduling a consultation where we get to know you, your family's needs, and your vision for the pool. We will discuss your design preferences, budget, and any specific features you desire. You will receive a proposal based on the consultation.

  • Pool Design and Planning

    Based on the information gathered during the consultation, we will create a custom pool design tailored to your preferences and backyard space. During this process, we will begin permitting and finalize all design and materials. This process from initiating the pool design through obtaining the permit takes 3-8 weeks depending on the permit review process.

  • Pool Installation

    When the permit is issued and the pool delivery is scheduled, the fun begins!

    Excavation begins the day before the pool is due to arrive. The day that the pool arrives contains many moving parts including the crane to set the pool, the excavator to backfill, and the pool water company to fill the pool!

  • Finishing Touches

    With the pool install complete, we focus on the finishing touches that add character and personalization. This includes tile selection, coping, decking, and any additional features, such as waterfalls or lighting.

  • Client Walkthrough and Handover

    Before we hand over your pool, we conduct a detailed walkthrough, explaining all the pool's features and operations. We are committed to making sure you feel confident in operating and maintaining your new pool.

Construction at a Glance

  • Excavation

    Excavate the designated area according to the pool's design specifications, ensuring the removal of any debris and preparing the site for installation.

  • Delivery & Placement

    Transport the fiberglass pool shell to the site and carefully position it within the excavated area using specialized equipment.

  • Backfilling

    Surround the pool shell with backfill material, ensuring proper support and stability. Compact the backfill to minimize the risk of settling.

  • Water Filling

    Fill the pool with water, closely monitoring for any leaks or issues.

  • Hardscaping

    Construct the pool patio and any additional hardscaping features, ensuring proper integration with the pool area and adequate drainage.

  • Landscaping & Finishing Touches

    Enhance the surrounding landscape with plants, mulch, and other elements. Complete the project with final touches such as fencing, safety barriers, and accessories.